Cherrybrook Metro Station Plaza

The Cherrybrook Metro Station is one of eight stations within the north-west metro line project designed to improve public transport connections, enhance the local amenity and facilitate future growth. Accessed through a central plaza on the south, this precinct makes a strong civic statement by seamlessly integrating with the nearby surroundings, supporting pedestrian traffic and visual connectivity and encouraging social interactions. Anchoring the plaza is a bold yet intuitive pavilion that hosts retail spaces and amenities which activates the forecourt.

The site was landlocked  a consequence of the adjacent and operational station entry, bus terminal and multi-storey car park. With no direct street access for deliveries to the construction site, the Brenic team provided innovative solutions to materials handling and construction methodologies in a live environment with extreme peak periods. Considered scheduling and strict traffic management measures complimented these solutions, ensuring the safe management of high volume commuters and associated vehicular traffic.

A small setback to the boundary and a substantial retaining wall, separated the project site from the live rail corridor, located below in a deep cutting. Brenic responded with a bespoke and technical solution for temporary works, ensuring the safety of both commuters and construction personnel.

The complexity of   was amplified by the presence of operational metro trains and facilities in the precinct. Brenic worked closely with stakeholders and coordinated the proposed works with relevant authorities. Thorough preplanning was then implemented to guarantee compliance with the requirements and protocols of these parties.

Brenic’s thorough and systematic approach added value in conducting clash detection and coordinating services reticulation with the primary structural steel along with provisions of cladding connections to achieve the architectural intent. These proactive measures assisted in identifying issues ahead of physical works, expediting the successful completion of the project.

The Cherrybrook Metro Station Plaza is one of two projects completed by Brenic as part of the north-west metro line Precinct Activation Program.  Both were completed ahead of schedule and exemplify our ability to deliver live environment complex projects.