Smithfield Pavement Restoration
The project was located on a busy site occupied by Australia’s leading manufacturer and supplier of piping systems. The external hardstand slabs, which support three stories of racking, had experienced differential settling. Over their 20 year lifespan, the fill beath had settle gradually and inconsistently, causingĀ 30mm steps between the slab panels. This gave rise to a number of issues including increased risk of trips and falls, rutting of the concrete slab as the vehicular passed over the steps and uneven stormwater runoff. The sewer main and failed shotcrete embankment situated beneath the slabs were at risk of damage from the additional surcharge of the rediverted stormwater runoff.
Delivered under a design and construct model, various options were evaluated. Alternatives considered included introducing a grid of concrete piles with dowels or corbels in the pile cap used to support the adjacent slabs, which would be levelled by grout injection. Ultimately, the option with the shortest duration was preferred. This involved replacing the entire slab, using a sand-cement mix to level the new slabs with the existing ones, and securing them together with dowels at the interfaces. Due to the subgrade’s poor bearing capacity, an alternative design was required, necessitating the involvement of additional consultants and approval from Sydney Water. Investigation at a hold point determined the subgrade did not achieve the required bearing capacity, necessitating an alternative design, involvement of additional consultants and approval from Sydney Water.
Throughout the project, Brenic worked to minimise disruptions to operations, including after-hours and weekend work. Despite encountering latent conditions, the project was completed in two months due to the efficient project management.